Sma 5000tl installation manual
This is done using two rotary switches in the Sunny Boy or by configuring the "CntrySet" parameter using a communication device. Set the arrows on the rotary switches to the required position using a screwdriver 2. Bluetooth networking with other inverters is deactivated ex works switch position 1 is the condition on delivery. Bluetooth communication is set using a rotary switch inside the Sunny Boy.
It is activated simultaneously with the red error LED beside the display. You can connect a separate consumer both in the event of errors and for trouble-free operation. Seal in the screw clamp There is a two-part seal in the screw clamp. See the communication module documentation for a detailed wiring diagram. This section describes how to install the communication module in the Sunny Boy.
Flip down the display and secure it. Attach the ribbon cable to the connector. Close the Sunny Boy as described in section 8. After 5 seconds or after you knock on the lid, the serial number or the name of the inverter are displayed. Electrostatic discharges can damage the Sunny Boy! Internal components of the Sunny Boy can be irreparably damaged by static discharge. Use a suitable measuring device on the AC terminal to ensure that there is no voltage present at PE.
The maximum diameter of the test tip may not exceed 2 mm. Check that the polarity is correct and ensure that the strings are assigned correctly as described in section 6.
The handle must be flush with the housing. You also need the installer password to access the installer mode. Set the "CoolSys. FanTst" parameter in installer mode to "On" using a communication device. To do so, check the metal tongues on the inside of the plug for brown discoloration. Worn-out metal tongues If at least one of the metal tongues is brown or fully burned off see figure above , the Electronic Solar Switch can no longer be guaranteed to function correctly.
Request this from SMA. SMA will then send you an e-mail containing a file with the corresponding settings and instructions on how to make them.
Open the Sunny Boy as described in section 8. Measurements can only be made and messages can only be displayed if there is sufficient DC voltage the green LED flashes or lights up. Page Error Messages Sunny Boy is too high.
For reasons of safety, the Sunny Boy If the grid voltage is within the disconnects itself from the grid. Page 60 For reasons of safety, the Sunny Boy limits.
If the grid voltage is within the acceptable range, but the error is still displayed, contact the SMA Technical Service Line. Page 63 PV generator. Page The Inst. Check the strings for ground faults as described below: Open the Sunny Boy as described in section 8.
Varistors are wearing parts. Their functioning diminishes with age or due to repeated responses as a result of overvoltages. It is therefore possible that one of the thermally monitored varistors has lost its protective function. Page 69 There is probably another fault in the Sunny Boy. There is no conducting The respective varistor is defective and must be replaced. The varistors are specially manufactured for use in the Sunny Boy and are not commercially available.
Page 70 If you do not receive a special tool for operating terminal the terminal clamps together with your replacement varistors, please contact SMA. As an alternative, the terminal contacts can be operated using a 3. Page Decommissioning Dispose of the Sunny Boy at the end of its service life in accordance with the disposal regulations for electronic scrap which apply at the installation site at that time. This also applies to the provision or non-provision of support activities.
Page 76 Sales Solar Technology www. D system Diazed or D0 system Neozed is not a load disconnection unit, and thus must not be used as a load disconnection unit. A screw type fuse element is only used as cable protection. When disconnecting under load using a screw type fuse element, the inverter can be damaged. Check that the grid voltage is within the permissible voltage range. The exact operating range of the inverter is specified in the operation parameters.
The corresponding document is located in the download area at www. Disconnect the line circuit breaker and secure against re-connection. Remove the Electronic Solar Switch. Check the correct country setting of the inverter using the supplement provided against the factory settings. If the inverter is not set to the desired country standard, then adjust the country standard as describedinsection5. Foreasyconnection,loosenthedisplayscrewsuntil the display raises. Unscrew the AC cable gland's lock nut G and remove the filler-plug from the cable gland.
There is a two-part seal in the cable gland. Remove the internal insert if necessary, e. Raise the AC clamp terminals as far as they will go. If 2 conductors are connected to one terminal, a poor electrical contact can result in overheating or a risk of fire.
Todothis,theinsulatedPEconductormustbe5mm longer than the insulated L and N conductors! Close all terminals of the AC terminal again until they snap into place.
Fold down the display and screw it tightly. Tighten the lock nut firmly to the cable gland. If a second protective conductor connection is required in the country of installation, you can also ground the inverter using a second protective conductor on the connection terminal on the enclosure.
Insert the stripped grounding cable D under the clamping clip C max. Welcome to ManualMachine. We have sent a verification link to to complete your registration. Log In Sign Up. Forgot password? Enter your email address and check your inbox.
Please check your email for further instructions. Enter a new password. SB TL Installation. Power range of the past 16 feed-in hours or energy yield of past 16 days switching the display is done by tapping on the display Failurethatcanberemovedon-site see chapter Information Information provides tips that are valuable for the optimal installation and operation of your product.
This symbol indicates the result of an action. Capacitive Discharge Currents PVmoduleswithlargecapacitiesrelativetoground,suchasthin-filmmoduleswithcellson ametallicsubstrate,areonlytobeimplementediftheircouplingcapacitydoesnotexceed 1, nF. Alternative uses, modifications to the inverter or the installation of components not expressly recommended or sold by SMA Solar Technology AG void the warranty claims and operation permission.
Danger to life due to high voltages in the inverter. Parts of the enclosure can become hot - risk of burn injuries! Possible damage to health as a result of the effects of radiation! Grounding the PV generator Comply with the local regulations for grounding the modules and the PV generator. Indicates the operation condition of the inverter. An error has occurred. Tap to switch on the display light and switch to the next display message.
Shows the status of Bluetooth Communication. Beware of hot surface. The inverter can become hot during operation. Avoid contact during operation. Observe all documentation that accompanies the inverter. The inverter must not be disposed of together with household waste.
For more information on disposal, see section CE mark. The inverter complies with the requirements of the applicable EC guidelines. The inverter is transformerless. RAL quality mark for solar products.
Device class label. Danger to life due to fire or explosion. Despite careful construction, electrical devices can cause fires. Risk of injury due to the heavy weight of the inverter. Multiple inverters installed in areas with high ambient temperatures Theremustbesufficientclearancebetweentheindividualinverterstoensurethecoolingair from the adjacent inverter flows freely.
Attachtheinvertertothewallbracketslightlytothe left of its final position. Check both sides of the inverter to ensure that it is correctly in place. The inverter is now securely mounted to the wall. Outdoor Installation Always use a lock suitable for outdoor installation.
Procedure 1. Secure one screw at least every mm. Suspend the inverter on the top hat rail using the opening on its rear wall. Securing the Inverter Against Excavation Additionally secure the inverter in the wall using screws.
Drill through the back wall of the enclosure. Use a suitable drill bit with a minimum length of mm.
Insert suitable wall anchor. Fasten the inverter. The screw must meet the following requirements: Length: at least mm Diameter: 8 mm Screw head Nooutside hexagon, no countersunk head The inverter is protected against excavation. Damage to the inverter through electrostatic discharges. Residual current protective device The inverter is equipped with an integrated all-pole sensitive failure current monitoring unit. Cable sizing The grid impedance of the AC cable must not exceed 1 ohm.
Danger to life due to fire. Seal in the AC cable gland There is a two-part seal in the cable gland. Pull the cable through. Risk of fire when connecting 2 conductors to a single terminal If 2 conductors are connected to one terminal, a poor electrical contact can result in overheating or a risk of fire.
L and N must not be swapped. Danger of crushing when terminals snap shut! The terminals close by snapping down fast and hard. The inverter is now connected to the public grid AC. Undo screw A by half way.
Fasten terminal C. The toothing of the lock washer B must face toward the terminal clamp. The inverter's enclosure is additionally grounded. You can ground multiple inverters as shown in the diagram below:. You can only view or download manuals with.
Sign Up and get 5 for free. Upload your files to the site. You get 1 for each file you add. Get 1 for every time someone downloads your manual. Buy as many as you need. View and download manuals available only for. Register and get 5 for free.
0コメント